Charnawati Khola Hydropower Project

Project Details

Charnawati Khola Hydropower Project

Project Highlights

Design Discharge 2.19 cum/sec
Gross Head 199 m
Installed Capacity 3.52 MW
  • Location: Dolakha
  • Start Date: 2068 B.S.
  • Completed Date: 2069 B.S.
  • Employer: Nepal Hydro Developer Pvt. Ltd.