Charnawati Khola Hydropower Project
Project Details
- Home
- Charnawati Khola Hydropower Project
Charnawati Khola Hydropower Project
Project Highlights
Design Discharge |
2.19 cum/sec |
Gross Head |
199 m |
Installed Capacity |
3.52 MW |
- Location: Dolakha
- Start Date: 2068 B.S.
- Completed Date: 2069 B.S.
- Employer: Nepal Hydro Developer Pvt. Ltd.