Lower Chhyangdi Khola Small Hydropower Project

Project Details

Lower Chhyangdi Khola Small Hydropower Project

Project Highlights

Design Discharge 1.30cum/sec
Gross Head 186 M
Installed Capacity 2.02 MW
  • Location: Lamjung
  • Start Date: 2071 B.S.
  • Completed Date: 2072 B.S.
  • Employer: Chhyangdi Hydropower Ltd.